A reverse curve consists of ?

Show explanation Expand Question

A reverse curve consists of two arcs of equal or different radii bending in opposite directions. This type of curve is used in road design and railway tracks to change the direction of travel smoothly.

Not clear enough?

Question 62

In order to determine the natural features such as valleys, rivers, lakes etc., the surveying preferred is ?

Show explanation Expand Question

In order to determine natural features such as valleys, rivers, lakes, etc., the preferred type of surveying is topographical surveying. Topographical surveys are used to map and describe the physical features of an area, including both natural and man-made elements.

Not clear enough?

Question 63

The vertical distance above or below the datum is called ?

Show explanation Expand Question

The vertical distance above or below the datum is called either the reduced level of the point or the elevation of the point. So, the correct answer is either (a) or (b).

Not clear enough?

Question 64

The index glass in an optical square is ?

Show explanation Expand Question

The index glass in an optical square is actually wholly silvered. The silvered surface reflects the image of the sighting line, while the unsilvered part allows the sighting line to pass through, facilitating alignment and measurement.

Not clear enough?

Question 65

The rise and fall method for obtaining the reduced levels of points provides a check on ?

Show explanation Expand Question

The rise and fall method for obtaining the reduced levels of points provides a check on all of these: foresights, backsights, and intermediates sights. This method helps in ensuring the accuracy of the leveling process by allowing for the verification of each measurement.

 

 

 

 

Not clear enough?

Question 66

An angle made by a survey line with the prolongation of the proceeding line, is known as ?

Show explanation Expand Question

An angle made by a survey line with the prolongation of the preceding line is known as a deflection angle. This angle is used in surveying to determine the change in direction of a line from the previous line or reference direction.

 

 

 

 

Not clear enough?

Question 67

The method of intersection in plane tabling is commonly used for ?

Show explanation Expand Question

all of the above 

Not clear enough?

Question 68

The collimation method for obtaining the reduced levels of points does not provide a check on ?

Show explanation Expand Question

The collimation method for obtaining the reduced levels of points does not provide a check on intermediate sights. This method primarily checks the accuracy of foresights, backsights, and change points but does not directly verify the intermediate sights.

Not clear enough?

Question 69

In a prismatic compass, the zero of the graduated ring is located at ?

Show explanation Expand Question

In a prismatic compass, the zero of the graduated ring is located at the south end. This arrangement allows the compass to read the bearing directly as the sighted object aligns with the corresponding reading on the compass card.

Not clear enough?

Question 70

A tie line in a chain surveying ?

Show explanation Expand Question

enables the surveyor to locate the interior details which are far away from the main chain lines